Case Study: Mining Efficiency

Case Study: Mining Efficiency



Fill out the form below to receive the full case study via email.

In the mining industry, aftermarket process improvements are essential to enhance hydraulic equipment functionality. To guarantee proper pre-fill and optimize accumulator efficiency, a client partnered with Whitman Controls to design a highly customized fitting to ensure safety, reliability, and cost effectiveness. The client’s lead project engineer, collaborated directly with Michael and Whitman’s engineering team. In under 5 weeks, the team designed, fabricated, and delivered a prototype for testing. The Whitman switch exceeded the client’s expectations, and came in over 35% below their previous supplier’s offering.


“I can’t say enough about Michael and the entire Whitman Controls team. Not only did they deliver a quality, custom switch in just 5 weeks, they came in under budget.”

– John / Lead Project Engineer, BHP